Environmental Engineering

Whether as a value-added service for a client’s project or as a stand-alone project, Phelps Engineering can provide a range of environmental services including environmental site assessments, brownfields redevelopment projects, and investigation and re-mediation of soil and groundwater contamination from underground storage tanks, spills, and improper waste disposal.


• Phase I and II Environmental Assessments (ESAs)
• Remediation of Contamination
• Brownfields Redevelopment


 

Representative Projects

Waitsfield Municipal Water System

• Research and Subsurface Drilling Investigation Near Leaky Underground Storage Tank Sites Before Water Main Installation: 2009

Projects Performed as a Subconsultant to The Verterre Group

The Verterre Group Site→
• Crossroads Mobil in Alburgh, Vermont
Dual Phase Extraction and Air Sparging System for Underground Storage Tank Leak – Pilot Test, Corrective Action Feasibility Study, Corrective Action Plan, and Startup and Operation of Remedial System: 2009
• Five Corners Mobil in Essex Junction, Vermont
Soil Vapor Extraction and Air Sparging for Underground Storage Tank Leak – Pilot Test, Corrective Action Feasibility Study, and Corrective Action Plan: 2008
• Airport Mobil in South Burlington, Vermont
Soil Vapor Extraction System for Underground Storage Tank Piping Leak – Pilot Test, Corrective Action Feasibility Study, and Corrective Action Plan: 2008
• Hillcrest Trucking Fuel Spill in Fairfax, Vermont
Soil Excavation and Off-Site Treatment – Phase II Site Investigation and Corrective Action Plan: 2007
• Service Station in Woodstock, Vermont
Chemical Oxidation Injection Plan for Underground Storage Tank Leaks – Corrective Action Feasibility Study and Corrective Action Plan: 2007
• Tudhope Marina Underground Storage Tank Leak in North Hero, Vermont
Oxygen Injection System – Corrective Action Feasibility Study and Corrective Action Plan: 2006
• New Haven Mobil Remediation Study in New Haven, Vermont
Corrective Action Feasibility Study for Remediation of Soil, Groundwater, and Drinking Water Contamination from Leaking Underground Storage Tanks: 2004-2006
• Morrisville Machine Shop, Morrisville, Vermont
Supervision of Remediation of Fuel Oil Contamination from a Leaking Underground Storage Tank – Corrective Action Plan, Design, and Construction: 2004
• Gas Station/Convenience Store Acquisitions
Topographic Surveys, Site Investigations, and Evaluation of Cleanup Strategies for Four Exxon-Mobil Gas Stations/Convenience Store Facilities: 2004

Aaron Harris

• Port Henry Marina - Environmental Records Review, Geoprobe Investigation, Soil and Groundwater Sampling, and Review of Redevelopment Options: 2005
Project Details→

Confidential Client

• Farm Dump Cleanup - Underground Storage Tank Removal Activities, Site Investigation Report, Solid Waste Removal, and Site Closure Report: 2004-2005
Project Details→

Royalton Public Safety Facility

• Underground Storage Tank Removal – Supervision of Underground Storage Tank Removal, Soil Testing, and Closure Report. Two Underground Storage Tanks (Heating Oil and Gasoline) and a Gasoline Dispenser Were Removed: 2005

Town of Cornwall

• Salt Contamination Remedial Program and Replacement Supply – Survey, Testing, Study, Design, and Construction: 1988

East Middlebury Fire District No. 1

• Management of Petroleum-Contaminated Soil and Groundwater During Water Main Construction: 2007

Point Bay Marina, Charlotte, Vermont

• Removal and Remediation of Petroleum-Contaminated Soil from a Floor Drain and Biotreatment of Soil: 2007-Present

Ferrisburgh Central School

• Removal and Remediation of Petroleum-Contaminated Soil from Leaky Fuel Oil Piping: 2007
Project Details→