Middlebury College has been a premier client of Phelps Engineering for approximately 25 years. We have assisted the College with a wide array of projects, some of which are depicted below. Most recently, we assisted the College with water main drainage improvements and new sidewalks in the Old Chapel Road area.
• Water Main Improvements for the Old Chapel Road Area - Design, Bid, and Construction: 2009
• Snow Bowl Wastewater Treatment Upgrade for Lodge Expansion – Design, Construction, and Annual Wastewater System Review: 2003-Present
• Ross Commons Pump Station and Sewer Main Extension – Final Design, Permitting, and Construction Review: 2000-2002
• South Athletic Fields Restroom Pavilions – Design and Construction Review: 1998
• Bicentennial Hall Pump Station – Design, Construction Review, and Commissioning: 1998
• Homer Noble Farm Septic System Design and Construction Review: 1998
• Sewer/Stormwater Separation – Design: 1994
• Snow Bowl Wastewater Treatment System – Design and Construction: 1994
• New Sidewalks and Drainage Improvements for McCullough Hall, Old Chapel Road, and the Commencement Area – Design, Bid, and Construction: 2009
• Alumni Football Field Turf Replacement and Drainage Improvements - Design: 2008
• Soccer Field Turf Replacement and Utility Improvements: 2007
• Snow Bowl Expansion – Design, Permitting, and Construction: 2004-2005
• Atwater Commons – Design, Permitting, and Construction: 2001-2004
Project Details→
• Ross Commons – Design, Permitting, and Construction: 1998-2002
Project Details→
• Softball Field – Survey, Design, and Construction: 1997-1998
• Bicentennial Hall and Way – Survey, Design, Permitting, and Construction: 1996-1999

• West Campus – Survey, Design, Permitting, and Construction: 1995-1998
• Kenyon Arena – Survey, Design, Permitting, and Construction: 1995-1999
• 50-Meter Natatorium (Pool) – Survey, Water Supply Design, and Construction: 1996
Project Details→
• Hadley-Milliken Dormitory – Survey and Design: 1996
• Old Chapel Renovations – Survey, Design, and Construction: 1995-1996
• Soccer Field/All-Weather Track – Survey, Design, and Construction: 1992-1994
• Football/Lacrosse Stadium – Survey, Testing, Design, and Construction: 1989-1991
• Service Building Parking and Utility Project – Survey, Design, and Construction: 1988
• Fine Arts Building – Survey, Design, and Construction: 1987-1991
• Utility Mapping/CADD Application – Survey, Mapping, and CADD Plans: 1986 and 1994
• Pepin and Nelson Arena Drainage Improvements - Design and Construction: 2008
• Johnson's Pond – Design, Permitting, and Construction: 2001-2004
Project Details→
Middlebury College Breadloaf Campus Master Planning – Top-Tier Award for Campus Planning from the Boston Society of Architects: 2008
Project Details→