From the first septic mound system design in Vermont to the first membrane filtration treatment plant in Vermont, Phelps Engineering has been on the forefront of developing innovative solutions to helping clients meet their ever more challenging wastewater problems.
• Collection
• Pumping
• Treatment
• Small Community Systems
• Soil Based Disposal Systems
• Technical Assistance in Developing a Guidance Document for Town Officials Entitled "Wastewater Solutions for Vermont Communities": 2007
• Wastewater Feasibility Study (prepared with Stone Environmental, Inc.): 2005-2006
Project Details→
• Performance Review of Force Main to Wastewater Treatment Facility: 2002
• Pump Stations 1 and 3 Improvements – Design/Build: 2000
• Birchard Park Sewer Upgrade – Design: 1999
• Combined Sewer Overflow Effectiveness Study: 1998
• Weybridge Street Pump Station Upgrade Recommendations – Design and Construction Management: 1995-1997
• Sewer and Stormwater Separation - Study, Design, Infrastructure Mapping, and Construction Services: 1989-1994
• Biosolids Holding Facility - Design and Construction Services: 1986
Project Details→
• Snow Bowl Wastewater Treatment Upgrade for Lodge Expansion – Design, Construction, and Annual Wastewater System Review: 2003-Present
• Ross Commons Pump Station and Sewer Main Extension – Final Design, Permitting, and Construction Review: 2000-2002
• South Athletic Fields Restroom Pavilions – Design and Construction Review: 1998
• Bicentennial Hall Pump Station – Design, Construction Review, and Commissioning: 1998
• Homer Noble Farm Septic System Design and Construction Review: 1998
• Sewer/Stormwater Separation – Design: 1994
• Snow Bowl Wastewater Treatment System – Design and Construction Services: 1994
Middlebury College Details→
• Wastewater System Upgrade – Preliminary, Design, Bid and Construction: 2001-2005
Project Details→
• Wastewater Plan Reviews: 2002-Present
• Community Wastewater System – Study, Soil Evaluation, Design, and Permitting: 2004-Present
• Community Wastewater System - Study and Facilities Plan: 1998-2004
Project Details→
• Wastewater Treatment System – Soils Evaluation, Study, Review of Alternative Processes, Final Design, Funding, Permitting Assistance, and Construction: 1994-2002
Project Details→
• Community Wastewater System – Study, Soil Evaluations, Design, and Permitting: 1998-Present
Project Details→
• Treatment Plant Upgrade to Include Sludge Removal and Disposal and Aeration System Replacement
– Design and Construction: 2000-2001
• Wastewater System Upgrade Evaluation and Cost Estimating: 2001-Present
Project Details→
• Wastewater System Renovation – Design, Permitting, Bid, and Construction: 2001-2002
• Sludge Recertification: 1999
• Sludge Management Plan – Study: 1991-1994
• Wastewater Collection and Treatment System – Study, Design, Permitting and Funding Assistance, and Construction Review: 1993-1999
Project Details→
• Wastewater Collection System – Design and Construction: 1997-1998
• Wastewater System Improvements – Design, Permitting Assistance, Construction Services, and Annual Wastewater Reviews: 1997-Present
• Cornwall Elementary School Mound Renovations – Evaluation and Construction Services: 1996
• Weybridge Elementary School – Preliminary Site and Soils Evaluation: 1994-1995
• Demonstration Project of Four Alternative On-Site Sewage Treatment Systems - Design/Build: 1995-1996
Project Details→