From the first commercial mound septic system design in Vermont to the first membrane filtration treatment plant in Vermont, Phelps Engineering has been on the forefront of developing innovative solutions to helping clients solve their ever more challenging wastewater problems.
• Soil Test Pits and Percolation Testing
• Wastewater Feasibility Studies
• Wastewater Collection Systems
• Wastewater and Effluent Pumping Stations
• Septic Systems
• Community Wastewater Systems
• Decentralized, Clustered, and Municipal Wastewater Treatment
• Technical Assistance in Developing a Guidance Document for Town Officials Entitled "Wastewater Solutions for Vermont Communities": 2007
• Community Wastewater System for 9-lot residential subdivision, Ferrisburgh Central School, and Ferrisburgh Town Offices/Grange Hall – Study, Soil Evaluation, Design, Permitting, and Construction: 2004-2008
Project Details→
• Cross Street Bridge West Side - Connector Road and Bakery Lane Sewers - Design, Bid, Permitting, and Construction: 2009
• Performance Review of Force Main to Wastewater Treatment Facility: 2002
• Pump Stations 1 and 3 Improvements – Design/Build: 2000
• Birchard Park Sewer Upgrade – Design: 1999
• Combined Sewer Overflow Effectiveness Study: 1998
• Weybridge Street Pump Station Upgrade Recommendations – Design and Construction: 1995-1997
• Sewer and Stormwater Separation - Study, Design, Infrastructure Mapping, and Construction: 1989-1994
• Biosolids Holding Facility - Design and Construction: 1986
Project Details→
• Snow Bowl Wastewater Treatment Upgrade for Lodge Expansion – Design, Construction, and Annual Wastewater System Operation & Maintenance Review: 2003-Present
• Ross Commons Pump Station and Sewer Main Extension – Design, Permitting, and Construction: 2000-2002
• South Athletic Fields Restroom Pavilions – Design and Construction: 1998
• Bicentennial Hall Pump Station – Design, Construction, and Commissioning: 1998
• Homer Noble Farm Septic System Design and Construction: 1998
• Sewer/Stormwater Separation – Design: 1994
• Snow Bowl Wastewater Treatment System – Design and Construction: 1994
Middlebury College Details→
• Wastewater System Upgrade – Design, Bid and Construction: 2001-2005
Project Details→
• Community Wastewater System – Study, Soil Evaluation, Design, Permitting, and Construction: 1998-2008
Project Details→
• Wastewater Feasibility Study (prepared with Stone Environmental, Inc.): 2005-2006
Project Details→
• Community Wastewater System - Study and Facilities Plan: 1998-2004
Project Details→
• Wastewater Treatment System – Soils Evaluation, Study, Review of Alternative Processes, Design, Funding, Permitting, and Construction: 1994-2002
Project Details→
• Wastewater Plan Reviews: 2002-2008
• Wastewater Treatment Plant Upgrade Including Sludge Removal and Disposal and Aeration System Replacement
– Design and Construction: 2000-2001
• Community Wastewater System for Beeman Elementary School, the New Haven Town Hall, and a Private Duplex Residence - Study, Soil Evaluation, Design, Permitting, and Construction: 1994
• Bristol Elementary School Grease Trap and System Expansion - Design, Permitting, and Construction: 1984-1988
• Monkton Central School Disposal Field for School Expansion - Design, Permitting, and Construction: 1987
• Mt. Abraham Union High School Expansion of Wastewater System - Design, Permitting, and Construction: 1997
Project Details→
• Wastewater System Renovation – Design, Permitting, Bid, and Construction: 2001-2002
• Wastewater Disposal System and Replacement System - Design, Permitting, and Construction: 1978, 1997, 2005
• Sludge Re-certification: 1999-present
• Sludge Management Plan – Study: 1991-1994
• Wastewater Collection and Treatment System – Study, Design, Permitting, Funding Assistance, and Construction: 1993-1999
Project Details→
• Wastewater Collection System – Design and Construction: 1997-1998
• Wastewater System Improvements – Design, Permitting, Construction, and Annual Operation and Maintenance Wastewater Reviews: 1997-Present
• Cornwall Elementary School Mound and Pump Station Renovations – Evaluation and Construction: 1996 and 2006
• Weybridge Elementary School – Preliminary Site and Soils Evaluation: 1994-1995
• Ripton Elementary School - Community Wastewater System for School and Fire Station – Design, Permitting, and Construction: 2003
• Demonstration Project of Four Alternative and Innovative On-Site Wastewater Treatment Systems - Design, Construction, and Testing: 1995-1996
Project Details→