Phelps Engineering has been providing water supply services in Vermont for more than 30 years ranging from advice for small private systems to development of new community systems involving source development, water treatment, storage, and distribution systems.
• Source Development
• Water Treatment
• Storage
• Distribution System Modeling & Rehabilitation
• New Public Water Supply System – Preliminary Design, Final Design, and Permitting: 2004-2005
Project Details→
• Feasibility Study and Source Development/Site Selection: 1998 - 2006
• New Public Water Supply System – Preliminary Engineering Study: 2007
• Final Design Services: 2006-present
Project Details→
• Blueberry Lane/Lower Plains Road Water Transmission Main – Planning and Design: 2004-2005
• Chlorine Contact Upgrades for Two Well Supplies: 2007
• Water Treatment Plant Upgrade, Transmission Main/Otter Creek Crossing, New Storage Tank - Basis of Final Design and Construction Services: 2002-2003
Project Details→
• Main Street Transmission Main Upgrade – Survey, Design, and Construction Services: 1996-1999
• 750,000 Gallon Storage Reservoir and Transmission Main - Study and Design: 1983
• Water Line Extension - Design and Construction Services: 2004
• Palmer Springs Well (1700 GPM) - Chlorine Contact Time Project: 2007
• Creek Road Water Main Improvements – Final Design and Construction Services: 2001- 2002
• Water System Base Maps in CADD format: 1999-2002
• New Source (Well 4) – Study, Drill, Pump Test, Final Design, and Construction Services: 1994-1999
Project Details→
• Source Protection Plans for Wells 1, 2, 3, and 4: 1998-1999
• Individual Wells to Replace Disconnected Source – Final Design and Construction Services: 1996
• Study for the Disconnection of Bristol Notch Springs and Palmer Springs Chlorine Contact Time: 1994-1995
• Comprehensive Water Planning Study: 1989
• 150,000-Gallon Storage Tank and Water Main Extension - Study, Final Design, and Construction Services: 2002-2003
• Surface Water Filtration Plant and Distribution System - Preliminary Design, Final Design, and Construction Services: 1992-1996
Project Details→
• Filtration Plant Expansion/New Clearwell and Water Mains: 2003
• Filter 3 Retrofit – Design and Construction Services: 1998-1999
• Zebra Mussel Control System – Bid and Construction Phase Services: 1995
• Water System Improvements Including Water Treatment Plant and Transmission Main – Study, Survey, Design, and Construction Services: 1988-1991
• East Barre/Barre Town Interconnection - Evaluation, Final Design, and Construction Services: 2000-2001
• Storage Reservoir, Booster Pump Station, and Distribution System Improvements – Final Design and Construction Services: 1993-1994
• Water System Improvements Project – Groundwater Exploration and Studies: 1984-1992
• Comprehensive Water System Improvements, Including Distribution System, Well Pump Station, Two Booster Pump Stations, and 500,000-Gallon Storage Reservoir - Study, Survey, Final Design, and Construction Services: 1994-1999
Project Details→
• Water Main Replacement – Final Design, Permitting, Funding Assistance, and Construction Services: 1999
• Water System Improvements Including a 250,000-Gallon Storage Tank, Transmission Main, and Controls – Study, Survey, Design, and Construction Services: 1986-1988
• Zebra Mussel Control System and New Intake – Bid and Construction Phase Services: 1998-2001
• Water System Feasibility Study: 2001
• Spring Box Improvements – Design and Construction Services: 2000
Project Details→
• Source and Storage Improvement Project – Groundwater Supply Development, Design, Funding Assistance, and Construction Services: 1987-1994
• Water System Improvements Including Storage, Meters, and Disinfection – Survey, Design, and Construction Services: 1986-1988
• Comprehensive Water Study – Evaluation or Required Improvements on a Town-wide and Segmented Fire District Basis: 1981-1983
• 300,000-Gallon Storage Tank and Transmission Main for Wilson Industrial Park - Design and Construction Services: 1981
• Ground Source Exploration: 1989
• permit Compliance Services: 2005 - Present
• Source Testing and Water System Improvements: 2007 - Present